4981.83 - Advantix Cleviva mounting flange
for Advantix Cleviva shower channel and Advantix Cleviva shower channel base unit
Trade mark rights exist for this document; for further information, go to viega.com/legal .
The information in this instruction manual is directed at the following groups of people:
Heating and plumbing professionals and trained personnel
Individuals without the abovementioned training or qualification are not permitted to mount, install and, if required, maintain this product. This restriction does not extend to possible operating instructions.
The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use.
Warning and advisory texts are set aside from the remainder of the text and are labelled with the relevant pictographs.
This symbol warns of possible life-threatening injury.
This symbol warns of possible serious injury.
This symbol warns of possible injury.
This symbol warns of possible damage to property.
This symbol gives additional information and hints.
This instruction for use contains important information about the choice of product or system, assembly and commissioning as well as intended use and, if required, maintenance measures. The information about the products, their properties and application technology are based on the current standards in Europe (e.g. EN) and/or in Germany (e.g. DIN/DVGW).
Some passages in the text may refer to technical codes in Europe/Germany. These should serve as recommendations in the absence of corresponding national regulations. The relevant national laws, standards, regulations, directives and other technical provisions take priority over the German/European directives specified in this manual: The information herein is not binding for other countries and regions; as said above, they should be understood as a recommendation.
The Advantix Cleviva mounting flange is intended for mounting on a Advantix Cleviva shower channel base unit.
The short-term temperature of the wastewater may reach up to 95° C. The temperature must be considerably lower in constant operation.
The pH value must be higher than 4 but lower than 10.
It is not permitted to introduce wastewater which would damage the product material.
For the complete assembly an Advantix Cleviva sealing collar (model 4981.82), an Advantix Cleviva shower channel profile (model 4981.30, 4981.31 or 4981.32) and a shower channel insert (model 4981.50 or 4981.60) are required.
The tiler set has to be handed over to the person responsible for the bonded sealing (tiler).
Determine the screed height H.
Shorten the dimension X on the mounting flange.
X = 155 mm - H
Deburr the mounting flange.
The height can be extended using a commercially available 50Ø HT pipe.
Apply a coat of lubricant for plastic pipes to the inside of the profile seal.
Push the flange into the odour trap as far as it will go.
The flange can be rotated around 360°.
Position the odour trap.
The arrows on the flange acts as alignment aids.
Fit a sound insulation mat beneath the odour trap as an option.
8 mm, art. no. 791 650
3 mm, art. no. 790 448
Shorten the connection pipe as required.
Push the sliding ring and the wedge seal onto the connection pipe.
Position the wedge seal on the groove.
Screw the connection pipe to the odour trap using the union nut.
Connect the drain to the wastewater system.
Align the flange horizontally in all directions and fasten.
Use fixing set article no. 797003 as an option.
Can be installed only in front of a plastered wall or a prefabricated wall.
The distances to the shower channel profile depend on the positioning of the odour trap.
X = minimum interval to wall
Y = maximum interval to wall
Interval to wall, odour trap model 4981.11 / 4981.81 | |||
---|---|---|---|
interval | A | B | C |
Minimum X | 27 mm | 16 mm | 14 mm |
Maximum Y | 36 mm | 25 mm | 23 mm |
Interval to wall, odour trap model 4981.10 / 4981.80 | ||||
---|---|---|---|---|
interval | A | B | C | D |
Minimum X | 14 mm | 8 mm | 5 mm | 21 mm |
Maximum Y | 23 mm | 17 mm | 14 mm | 30 mm |
Cut the side of the reinforcement area on the wall with a blade.
The flooring height (bonded sealing + adhesive + tiles) must not exceed 30 mm.
Lift up the label.
Fill the drain unit with water.
Check the drain casing and the connection line for leaks.
Re-affix the label.
Product damage due to improper installation
If hollow spaces occur during the lining of the shower channel, leaks may occur when pressure is applied.
Inform the subsequent workers that the shower channel must be fully lined and that there must be no hollow spaces.
The screed and floor tiles must be laid at an incline of 1–2 % in the direction of the shower channel.
Requirement:
The site protection has been mounted.
Line the shower channel with screed.
Fill with screed to the upper edge of the site protection.
The seal set has to be handed over to the person responsible for the bonded sealing (tiler).
Only use the sealing accessories included in the scope of delivery.
For wall mounting, work the sealing collar on the upright wall into the bonded sealing.
Remove and dispose of the site protection.
*The flange must be clean and free from material residues.
Grease the sealing element.
Clip the sealing collar into the flange.
Check that the sealing element is properly positioned.
Fit the sieve insert.
Insert the wooden site protection.
Push the sealing collar into the flange as far as it will go.
All four fixing points must engage.
Observe the bonded sealing manufacturer's instructions for use.
Fold together the sealing collar.
Apply the first layer of bonded sealing generously onto the screed and the flange.
Push the sealing into the bonded sealing, which is still in the liquid state, without wrinkles.
Once the first layer has dried, apply the second layer of the bonded sealing generously onto the sealing collar and screed.
The shower channel profile can be shortened.
Coloured shower channel profiles must not be shortened.
The shower channel profile is divided into two drain zones.
The shower channel profile can be shortened by up to 100 mm at the ends of the drain zone.
To be able to achieve individual profile lengths, the shower channel profile and the tiles are at the same height.
Profile length | Shortening range |
---|---|
800 mm | 600–800 mm |
1000 mm | 800–1000 mm |
1200 mm | 1000–1200 mm |
In the drain zone, the shower channel profile can be shortened to a minimum installation length of 150 mm from centre of the drain.
The resultant offset between the shower channel profile and the tile can be closed with a tile end rail or with silicon.
If channel solutions >1200 mm are required, the standard lengths of 800, 1000 and 1200 mm can be combined with one another.
To avoid an offset when laying several profiles, shorten the profiles only at the drain zone (max. 100 mm).
Profile length | Shortening range |
---|---|
2 x 800 mm | 1200–1600 mm |
2 x 1000 mm | 1600–2000 mm |
2 x 1200 mm | 2000–2400 mm |
Determine the required dimension and mark at right angles.
Using a handsaw, shorten the shower channel profile at right angles and deburr.
Alternatively, the shower channel profile can be shortened using an electric metal slitting disc or a speed-restricted angle grinder with suitable stainless steel slitting disc.
To prevent corrosion, the tools must not have been used beforehand for processing ferrous materials.
Insert the shower channel profile into the height adjustment piece as far as it will go.
Make sure that shower channel profile protrusion sits exactly in the recess of the height adjustment piece.
Determine the flooring height H.
For fault-free drainage, Viega recommends laying the floor covering 1–2 mm higher than the shower channel profile.
Due to the stepless shortening of the top, an installation height of at least A 12 mm to B 30 mm is possible for tiles and tile adhesive.
Lay the floor covering 1–2 mm higher than the shower channel profile.
Dimension X = 30 mm - H
Shorten dimension X along the cutting aid and deburr.
Unroll the butyl tape and cut to size.
Stick the butyl tape centrally on the underside of the shower channel profile.
Remove the protective foil.
Apply the tile adhesive over the entire surface of the shower channel profile and the height adjustment piece.
Remove the site protection.
Do not damage the bonded sealing.
Insert the shower channel profile and the height adjustment piece.
Align the shower channel profile and the height adjustment piece horizontally.
The shower channel profile can be radially rotated by max. 10 mm (with a 1200 mm shower channel profile).
The height adjustment piece can be moved on the long side by 3.5 mm and on the head side by 10 mm.
To allow the shower channel profile to be adapted to the tile pattern, the profile mount is eccentrically positioned by 7.5 mm.
After alignment, fasten the height adjustment piece with tile adhesive.
Fit the insert.
Two insert variants are available:
Inlet opening double, model 4981.50
Inlet opening single, model 4981.60
Apply the tile adhesive.
Lay the floor tiles up to the shower channel profile.
Seal any gaps between tile and grate element with a suitable filler material or joint filler.
Normal soap or a mild cleaning agent can be used for regular maintenance and prevention of lime scale on the grate and frame. Use no scouring agent or abrasive objects.
Strong stains, even around the drain unit and the siphon, can be removed using typical household cleaner. Rinse the detergent very thoroughly with clear water after the prescribed dwell time. There should be no residue on the components.
Separate the product and packaging materials (e. g. paper, metal, plastic or non-ferrous metals) and dispose of in accordance with valid national legal requirements.